so close


Ok, the sweater and I are speaking again. I finished the seaming and did one cuff last night and it’s cute. It’s heavy and a bit bulky but it’s turning out good. So I didn’t make my goal of having it ready for today, but it’ll definitely be ready for tomorrow. The size is fine too though I do think my shoulder/arm seaming is a little off somehow. When I do set in shoulders they always seem a little puffy, but these look fine when I put it on. Maybe I got the cap part a little big and that makes it seem slightly gathered? I think what I really need next is a finishing class.



screw you Ovaltine, I’m going home


So this sweater hates me. I really, really know deep down that with practice I am going to become a sweater making fiend, but I seriously have no idea what I have done wrong with this sweater. I did the buttonhole band and attached it last night, and then seamed in the sleeves. Great.

Then I slipped it ‘on’ to see how it was fitting and now I’m really worried that it’s too small. The arms seem short, and a bit tight by the shoulder and the body seems shorter and tighter than I thought it would be. Maybe it’s just the fact that I haven’t finished all the seaming. I know the cuffs and waistband will add some length there. But the body and sleeves?? I got gauge. I knit a HUGE size and the sweater has like 4″ of ease built into the numbers. How can this be that small? I am determined to finish it tonight so that I can know for sure if I need to redo anything (mostly worried about the sleeves), so I guess I’ll find out in a few hours if I’m jumping to conclusions. In other news, this sucker is HEAVY so maybe the weight of it will stretch it out.

I started my second sock last night, yippee! I decided I’d try the new technique on the second one and then if it works I’ll rip back the first one and fix it. I also thought I’d make the small size and see if that fit a bit better. And that’s pretty much it.



more yarn!


So when I was shopping for gift yarn last week I saw this beautiful sock yarn on Etsy and decided to order it. I thought I’d make socks for my step mom or someone else (since socks might be the present de l’annee for xmas this year), but I got it yesterday and I totally want this yarn for myself. I rationalize this by telling myself I also got 2 more sock yarns that are also very yummy that I am totally making into gifts so 2 for gifts 1 for me is not so bad.

enchanted knoll yarn

The picture is not the best, it was cloudy yesterday. I’ll try again today when I get home.

I also got some more Manos in Bramble yesterday (a Ravelry purchase I mentioned before) so I think I need like 6 more skeins before I can try a basic bottom up (or top down-haven’t decided) cardigan with it. That’s fine, I think I’m going to try to trade for the rest of the yarn as well because I mean for this cardi to be a comfy home/weekend type garment so I’m not worried about the dye lots being exact, etc. Besides it’s edging toward spring here so I should try doing this project in the fall maybe so I can wear it Fall/Winter 2008.

So speaking of the weather…it was in the 80′s this weekend, but now it’s cold again. It’ll get warm again by Wednesday and then cold Thursday. Yes, it’s spring in Austin so we get weather changes of 20+ degrees at least once a week. Me and my allergies and my head hate this time of year.

But what I was thinking was wouldn’t it be cool to have my Ovaltine finished enough to wear by Thursday since the high is only supposed to be in the 50′s and it’s supposed to be really cold (uh, that’s 30′s for us) on Friday morning. I think that is a good goal, I’m not too sure how realistic it is, but I’m going to try for it anyway.

I managed to get the neck issue sorted out, the shoulders reseamed, the collar done and the buttonband done and attached last night. I estimate I have about 4 hours of work left on the sweater (not including another blocking). I have the buttonhole band, the 2 cuffs and the waistband (which I’m modifying so it won’t be such a pain in the ass) and the rest of the seaming and the buttons (which I just ordered today- but I can wear it without buttons). I could totally finish that by Thursday.

ovaltine sweater

It would be nice to finish the sweater because it would free me to finish the hat (another 2-3 hours work) and my socks (2-3 days, not sure how many hours) and maybe even Ella’s blanket and perhaps swatch for the $1.50 Cardigan. That would be so awesome and would help with the March to the Finish (rav link) thing I’m trying to do (ok I guess I’ve signed up for). So must finish sweater.